Power shutdown 24 April 2018

Dear residents,

Due to introducing an Embedded Network into the Wigan, a 6 hour power shutdown will be required between 10am to 4pm on Tuesday 24th of April.

Thank you in advance for your cooperation,
Building Management

Leave a comment